partialviews_card-4

STUDIO VENEZIA

The project STUK is featured in the film Actual Size Real Time #1 Partial Views by film makers Julie Pfleiderer and Miriam Rohde. We are proud to be part of this project, presented in Venice during the month of September

partialviews_card-4

STUDIO VENEZIA

The project STUK is featured in the film Actual Size Real Time #1 Partial Views by film makers Julie Pfleiderer and Miriam Rohde. We are proud to be part of this project, presented in Venice during the month of September

winter-beeld

WINTER – Gent, BE

Upgrading of a unifamiliar habitat with a new rooftop terrace and shower room (design 2013 – 2015 completed) The clients asked to upgrade the energy-efficiency of their house and to envision a rooftop terrace on the second floor (on top

winter-beeld

WINTER – Gent, BE

Upgrading of a unifamiliar habitat with a new rooftop terrace and shower room (design 2013 – 2015 completed) The clients asked to upgrade the energy-efficiency of their house and to envision a rooftop terrace on the second floor (on top

View through groundfloor living spaces

BELFORT – Gent, BE

Reconversion of a bel-etage townhouse in central Ghent into three habitats (design icw Mathias Vandenbulcke) 2009 – 2015 ENG: An extension in wood-construction has been added at the back of the plot, replacing the precarious, stone extension. The pitched roof

View through groundfloor living spaces

BELFORT – Gent, BE

Reconversion of a bel-etage townhouse in central Ghent into three habitats (design icw Mathias Vandenbulcke) 2009 – 2015 ENG: An extension in wood-construction has been added at the back of the plot, replacing the precarious, stone extension. The pitched roof

Window separating vestibule and bathroom

STUK – Gent, BE

Reconversion of an apartment block (1940) with 4 apartments and storage into 6 habitats with communal garden (2010-2014) Communal housing project with architect’s own habitat, a 90 m2 apartment. The original lay-out was completely rearranged: living quarters were relocated to

Window separating vestibule and bathroom

STUK – Gent, BE

Reconversion of an apartment block (1940) with 4 apartments and storage into 6 habitats with communal garden (2010-2014) Communal housing project with architect’s own habitat, a 90 m2 apartment. The original lay-out was completely rearranged: living quarters were relocated to

Canopied roof of the carport.

ZILVER – Rijmenam, BE

Rearrangement with extension of a unifamiliar habitat (design 2007 – completed 2009) An old farmhouse in a wooded area close to the meandering Dijle river. The clients wanted to add a wintergarden and needed a covered parking space. I chose

Canopied roof of the carport.

ZILVER – Rijmenam, BE

Rearrangement with extension of a unifamiliar habitat (design 2007 – completed 2009) An old farmhouse in a wooded area close to the meandering Dijle river. The clients wanted to add a wintergarden and needed a covered parking space. I chose

Entrance pavilion

KLEI – Oosterzele, BE

Unifamiliar habitat (design in collaboration with Bruno Heuleu 2008 – 2011 completed) This new habitat functions on the ground floor and has a towering room that relates to tall poplar trees growing across the road. A square floor plan with

Entrance pavilion

KLEI – Oosterzele, BE

Unifamiliar habitat (design in collaboration with Bruno Heuleu 2008 – 2011 completed) This new habitat functions on the ground floor and has a towering room that relates to tall poplar trees growing across the road. A square floor plan with